Skip to content

How We Work

Six steps from first ladder to final sweep.

How we work

Six Steps From First Ladder to Final Sweep

Nothing here is unusual. What matters is that each step happens in order, gets written down, and is finished before the next one starts.

We walk the roof where it is safe, get into the attic where we can, and send you the photographs the same day, marked up so you can see what we are talking about.

One price, itemised by square. You see the shingle, membrane or panel options side by side with what each adds to the total and how long each is expected to last.

We pull the permit, book the dumpster and time the material drop so pallets are not sitting on your drive for a week. You get the dates in writing.

Beds, shrubs and air conditioning units are covered first. The old roof comes off in sections so nothing is left open overnight, and any soft sheathing is replaced before underlayment goes down.

Underlayment, ice and water shield, starter course, field, hip and ridge, then flashing and ventilation. Fastener pattern and nail depth follow the manufacturer sheet, not habit.

Magnet sweep across the lawn and drive, a walkthrough with photographs of the finished details, and your warranty documents registered with the manufacturer before we leave.

Why choose us

What Sets Our Roofing Crews Apart

Four things decide whether a roofing job goes well, and none of them are the brochure. They are the schedule, the price, the hands doing the work and what happens if something moves later.

We start when we said

A confirmed date, a delivery window for materials, and a call the evening before. Weather delays are told to you, not discovered by you.

One written price

Squares, underlayment, flashing and disposal all appear on the estimate. Hidden deck rot is the one variable, priced per sheet before we touch it.

Certified installers

Crews carry current manufacturer certification, which is what makes the extended material warranty valid rather than merely printed.

Ten-year workmanship cover

If our flashing detail or fastening lets water in, we come back and fix it at no cost. The warranty transfers once if you sell the house.

How the work breaks down

Inspection and photo report 95%
Installation to spec 92%
Magnet sweep and cleanup 98%

FAQ

The Questions Homeowners Ask on the Driveway

If yours is not here, call and ask. Nobody at this number works on commission, so you will get the answer rather than a pitch.

Most single-family homes are torn off and reroofed within one to two working days. Steep pitches, multiple dormers or hidden deck damage can add a day, and we tell you before the crew arrives if that is likely.

We document the damage with dated photographs, slope measurements and a written scope your adjuster can price directly. We do not file the claim for you, but we will meet the adjuster on site.

Architectural and three-tab asphalt, standing seam and exposed-fastener metal, synthetic slate and shake, and single-ply membrane for low-slope and flat sections. We are certified installers for the systems we quote.

If the damage is localised and the field shingles still have granules and flexibility, repair is usually the better spend. Widespread granule loss, curling edges or a third leak in two years points the other way, and we will say so.

Beds, shrubs, windows and any outdoor units get covered before the first shingle moves. Debris drops into a ground tarp, and we run a rolling magnet over lawn, drive and kerb at the end of each day.

Ten years on our workmanship, transferable once, alongside the manufacturer warranty on the materials themselves. We register the material warranty on your behalf before the job closes.

Yes, and it usually costs less than booking them separately because the scaffolding, disposal and crew mobilisation are shared. It also means one warranty covering the roof-to-wall junction.

Active leaks are triaged the same day we hear about them. If conditions are unsafe for the roof, we tarp from below or from a ladder line and return for the permanent repair once the weather clears.

Let’s Get a Solid Roof Over Your Head

Book the inspection, get the photographs, then decide. There is no charge for the visit and no obligation to use us afterwards.