Skip to content
4.9 / 5 · 340 homeowner reviews

Roofing, Gutters and Siding Built for the Weather Ahead

We climb up, photograph what is actually happening on your roof, and give you one written price with no line items added later. Licensed, insured, and finished when we said we would be.

Book a Free Inspection
0 + Years on rooftops
0 + Roofs replaced
0 + Certified installers
0 % Pass first inspection
Same-week roof inspection Manufacturer-certified crew

About us

Keeping Weather Out of Buildings Since Two Thousand and Two

SWP Roofing began as a two-person crew working weekends on storm-damaged bungalows. Two decades later we run six crews across residential and light commercial work, and the rule has not changed: nobody quotes a roof they have not walked.

Shingles, standing seam, flat membrane, gutters, soffit and siding are all handled in-house, so there is one crew on site, one schedule to track and one number to call.

  • Every roof walked before it is priced
  • Deck rot priced per sheet, never estimated
  • Licensed, insured and permit-ready
  • Magnet sweep at the end of every day

Our vision

A roof should be forgettable. We want homeowners to go a full twenty years without thinking about the thing over their heads, because nothing up there ever gave them a reason to.

Our mission

Photograph every problem before we price it, use the fastener pattern the manufacturer specifies rather than the one that is faster, and leave the property cleaner than the day we pulled in.

Services

Roof, Gutter and Siding Work Under One Crew

The envelope of a building fails at its edges, which is why we handle the roof, the drainage and the walls together instead of leaving three contractors to blame each other. Pick a trade to see what is involved.

Full roof replacement

Full roof replacement

Complete tear-off to the deck, rotten sheathing swapped out, ice and water shield at every valley, then a new system installed to manufacturer spec. Most homes finish in one to two days.

  • Tear-off to bare deck
  • One to two days on site
  • Deck rot priced per sheet
Service details

Why choose us

What Sets Our Roofing Crews Apart

Four things decide whether a roofing job goes well, and none of them are the brochure. They are the schedule, the price, the hands doing the work and what happens if something moves later.

We start when we said

A confirmed date, a delivery window for materials, and a call the evening before. Weather delays are told to you, not discovered by you.

One written price

Squares, underlayment, flashing and disposal all appear on the estimate. Hidden deck rot is the one variable, priced per sheet before we touch it.

Certified installers

Crews carry current manufacturer certification, which is what makes the extended material warranty valid rather than merely printed.

Ten-year workmanship cover

If our flashing detail or fastening lets water in, we come back and fix it at no cost. The warranty transfers once if you sell the house.

How the work breaks down

Inspection and photo report 95%
Installation to spec 92%
Magnet sweep and cleanup 98%

Featured work

Recent Roofs, Gutters and Exteriors

A sample of jobs from the last two seasons, from a single-day shingle replacement to a commercial flat roof recoated over a live warehouse.

Shingles

Architectural shingle replacement

Maplewood Rise · 34 squares · two days on site
Gutters

Terrace re-roof and gutter rebuild

Springfield row · Six units · phased over one week
Storm

Storm damage and siding repair

Cedar Hollow · Full rear elevation · tarped same day
Metal

Standing seam metal retrofit

Ridgeway Court · 28 squares · three days on site

How we work

Six Steps From First Ladder to Final Sweep

Nothing here is unusual. What matters is that each step happens in order, gets written down, and is finished before the next one starts.

We walk the roof where it is safe, get into the attic where we can, and send you the photographs the same day, marked up so you can see what we are talking about.

One price, itemised by square. You see the shingle, membrane or panel options side by side with what each adds to the total and how long each is expected to last.

We pull the permit, book the dumpster and time the material drop so pallets are not sitting on your drive for a week. You get the dates in writing.

Beds, shrubs and air conditioning units are covered first. The old roof comes off in sections so nothing is left open overnight, and any soft sheathing is replaced before underlayment goes down.

Underlayment, ice and water shield, starter course, field, hip and ridge, then flashing and ventilation. Fastener pattern and nail depth follow the manufacturer sheet, not habit.

Magnet sweep across the lawn and drive, a walkthrough with photographs of the finished details, and your warranty documents registered with the manufacturer before we leave.

Our Numbers Say More Than Our Adjectives Do

Twenty-four seasons, six crews and a callback rate we publish rather than hide. If a detail we installed lets water through, it comes back to us, so we would rather get it right the first time.

0 +

Manufacturer certifications and local trade awards held by our installers.

0 +

Squares of roofing installed across homes, storefronts and light industrial units.

Testimonials

What People Say After the Next Storm

The real review of a roof arrives months later, in weather. These are from customers we went back to after one.

“They found the leak two other roofers had missed, and it was not even on the roof.”
Rachel Adeyemi — Homeowner, Birch Lane

The estimate matched the invoice to the cent. Two sheets of decking were rotten and they showed me the photographs before adding the line, at the price quoted per sheet.

Marcus Whitfield Homeowner, Maplewood Rise

Hail came through in June and they had a tarp on our back slope before dark. The claim went through on the first submission because their photo report was that thorough.

Elena Cabrera Homeowner, Cedar Hollow

FAQ

The Questions Homeowners Ask on the Driveway

If yours is not here, call and ask. Nobody at this number works on commission, so you will get the answer rather than a pitch.

Most single-family homes are torn off and reroofed within one to two working days. Steep pitches, multiple dormers or hidden deck damage can add a day, and we tell you before the crew arrives if that is likely.

We document the damage with dated photographs, slope measurements and a written scope your adjuster can price directly. We do not file the claim for you, but we will meet the adjuster on site.

Architectural and three-tab asphalt, standing seam and exposed-fastener metal, synthetic slate and shake, and single-ply membrane for low-slope and flat sections. We are certified installers for the systems we quote.

If the damage is localised and the field shingles still have granules and flexibility, repair is usually the better spend. Widespread granule loss, curling edges or a third leak in two years points the other way, and we will say so.

Beds, shrubs, windows and any outdoor units get covered before the first shingle moves. Debris drops into a ground tarp, and we run a rolling magnet over lawn, drive and kerb at the end of each day.

Ten years on our workmanship, transferable once, alongside the manufacturer warranty on the materials themselves. We register the material warranty on your behalf before the job closes.

Yes, and it usually costs less than booking them separately because the scaffolding, disposal and crew mobilisation are shared. It also means one warranty covering the roof-to-wall junction.

Active leaks are triaged the same day we hear about them. If conditions are unsafe for the roof, we tarp from below or from a ladder line and return for the permanent repair once the weather clears.

Let’s Get a Solid Roof Over Your Head

Book the inspection, get the photographs, then decide. There is no charge for the visit and no obligation to use us afterwards.