Skip to content

Terrace re-roof and gutter rebuild

Springfield row · Six units · phased over one week

Six adjoining units re-roofed in sequence so no household lost access to their own front door for more than an afternoon. The shared gutter line was rebuilt as one continuous seamless run with the downspouts resized to the area actually draining into them, which finally stopped the overflow at the eastern end.

More work

Other recent projects

Shingles

Architectural shingle replacement

Maplewood Rise · 34 squares · two days on site
Storm

Storm damage and siding repair

Cedar Hollow · Full rear elevation · tarped same day
Metal

Standing seam metal retrofit

Ridgeway Court · 28 squares · three days on site