Four teams each kept their own spreadsheet, and the weekly meeting was spent arguing about which was right. The work here was mostly subtraction: deciding which numbers actually changed a decision, then drawing only those.
In week two I recommended cutting a feature rather than designing it. That conversation saved a full quarter of engineering.