SWP Scaffolding has been putting up steel and aluminium access since 2001. We started with two crews and a yard outside Springfield, and we still run the business the same way: our own stock, our own erectors, and a supervisor who answers the phone when the sequence changes on site.
Access planned around your programme
Every trade behind you is waiting on the deck. Scaffold is a schedule problem before it is a steel problem, so we plan lifts around your sequence, agree handover dates in writing, and tell you early if anything is going to move.
- Designs and load calculations signed off by a chartered engineer.
- Carded, trained erectors with fall-protection training refreshed annually.
- Every structure tagged, logged and re-inspected on a seven-day cycle.
- Enough stock in the yard for four simultaneous contracts.
From two-storey shopfronts to sixteen-week facade contracts on occupied buildings, the standard does not change: built to design, handed over on a green tag, struck clean.