24/7 site support: +1 (000) 555-555
Ultra-class haul truck on a mountain mine site

Moving mountains safely, shift after shift.

One contractor from first drill hole to final rehabilitation. We hit your tonnage targets, publish every number, and send every crew member home safe.

Get a quote in 24 hours

Tell us what you mine. An engineer will call you back within one business day.

No obligation. We never share your details.

38+ Active mine sites in 11 countries
14M Tonnes of ore and waste moved each year
96% Average fleet availability across contracts
0.21 Lost-time injury frequency rate in 2025
27years running mines for other people

A contractor that runs your mine like it owns it

Since 1999, SWPmining has grown from one drill rig into a full-service mining contractor. Operators bring us in when they need production to start fast, stay on plan and stay safe.

  • One contract for the full mine life
  • Owned fleet, average age 4.2 years
  • Local hiring and training on every site
  • Live production data, 24/7
  • Fixed-rate or cost-per-tonne pricing
  • Mobilise in 8 to 12 weeks
Explore our services
Mark DavidsonFounder & CEO

From site visit to full
production in 4 stages

Every contract follows the same road, so you always know what happens next, how long it takes and who is accountable.

  1. 01 Weeks 1–2

    Site assessment

    Our engineers visit site, review your geology and block model, and size the right fleet.

  2. 02 Weeks 3–5

    Mine plan & proposal

    You get a costed production plan, schedule and safety plan with every assumption written down.

  3. 03 Weeks 6–14

    Mobilise & commission

    Equipment, people, workshops and dispatch systems arrive on site and start producing.

  4. 04 Ongoing

    Operate & report

    Shift-by-shift data on a live dashboard, plus a monthly review with your site manager.

Want to know what your site needs? The assessment is free.

Book a site assessment

Results we can
put numbers on

Real operations we run today. Each one is measured on safety, tonnage and cost per tonne.

Atacama copper pit expansion
CopperChileLoad & Haul

Atacama copper pit expansion

The operator needed to double waste movement within a year at 3,900 m altitude. We redesigned haul roads, brought in a new fleet and trained 140 local operators.

+32%ore throughput
−14%cost per tonne
0lost-time injuries
Talk to us about a similar project
Bushveld conveyor upgrade
PlatinumSouth Africa

Bushveld conveyor upgrade

A 3.8 km overland conveyor built and commissioned with zero downtime.

2 weeksahead of schedule

Our own fleet,
ready to mobilise

We own and maintain our equipment, so you don't wait on hire companies or pay for idle machines.

186

Haul trucks

Rigid and ultra-class trucks for pits of every size.

Payload
90–360 t
Avg. age
3.9 yrs
64

Excavators & shovels

Hydraulic face shovels and backhoes matched to truck size.

Operating weight
120–600 t
Avg. age
4.6 yrs
72

Drill rigs

Blast hole, RC and diamond core rigs with GPS guidance.

Hole diameter
89–311 mm
Avg. age
4.1 yrs
118

Support equipment

Dozers, graders, water carts and wheel loaders.

Units on standby
22
Avg. age
4.4 yrs

440+ machines in total Hybrid and trolley-assist options available Telematics on every unit

Safety and sustainability, drilled into every layer

We don't trade safety for tonnes. Every site works under one global safety system, and every mine plan includes a plan to put the land back.

ISO 45001 Safety ISO 14001 Environment ISO 9001 Quality
Download our 2025 ESG report
0.21Lost-time injury frequency rate, 62% below industry average
1,460 daysWithout a lost-time injury at our Pilbara operation
−18%Diesel use per tonne since 2021
62 haLand rehabilitated and revegetated in 2025
84%Of our site workforce hired locally

What mine operators
say about us

4.9/5Average client rating from 120+ post-project reviews

Questions operators ask us

Straight answers about contracts, timing and pricing. If yours isn't here, call us.

+1 (000) 555-555Speak with a mining engineer, Mon–Fri 7am–6pm
How quickly can you start on our site?

Most projects mobilise in 8 to 12 weeks after contract signing. For urgent takeovers we have standby equipment and crews, and have started production in as little as 6 weeks.

How do you price mining contracts?

We offer cost-per-tonne, fixed monthly rate, or schedule-of-rates pricing. Many clients choose cost-per-tonne with performance incentives tied to safety and production.

Can you work with our existing fleet and people?

Yes. We can operate and maintain your own equipment, take on your existing workforce, or mix our fleet with yours.

What is the minimum project size?

Our services start from around 500,000 tonnes per year for load and haul. Drilling and processing work can be smaller. Talk to us about your site.

Which countries do you operate in?

We currently run sites in 11 countries across South America, Australia, Africa and North America, and we mobilise to new regions for long-term contracts.

Build your career in mining

We're hiring across all our sites. Fair rosters, full training and a safety culture you can trust.

Haul truck operators Heavy diesel fitters Drillers Mining engineers Shot-firers
View open roles

Let's talk about your site

Send us a few details and a mining engineer will reply within one business day with next steps.

Head office

123 Maplewood Lane Apartment 4B
Springfield, IL 62704 USA

Request a site assessment

Fields marked * are required.

Call now Get a free quote