{"id":27,"date":"2026-09-18T04:51:34","date_gmt":"2026-09-18T04:51:34","guid":{"rendered":"https:\/\/scintillawpthemes.com\/demo\/swp-construction-pro\/projects\/oak-street-office-block\/"},"modified":"2026-09-18T04:51:34","modified_gmt":"2026-09-18T04:51:34","slug":"oak-street-office-block","status":"publish","type":"project","link":"https:\/\/scintillawpthemes.com\/demo\/swp-construction-pro\/projects\/oak-street-office-block\/","title":{"rendered":"Oak Street Office Block"},"content":{"rendered":"<p>A four-storey in-situ concrete frame with three retail units at street level and offices above, on a tight downtown plot with no lay-down area.<\/p>\n<p>Every pour was scheduled around a single street closure window, with rebar delivered the same morning it was tied. We ran a two-crane sequence for eleven weeks to keep the frame moving while the retail fit-out started below.<\/p>\n<p>The frame topped out three weeks ahead of programme. That buffer absorbed a six-day delay on the curtain-wall delivery and still let us hand the building over two weeks early.<\/p>\n<p>The ground floor was handed over first so the retail tenants could begin their own fit-outs while we completed the upper floors.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>A four-storey concrete frame with ground-floor retail, handed over two weeks early.<\/p>\n","protected":false},"featured_media":28,"menu_order":1,"template":"","project_category":[3],"class_list":["post-27","project","type-project","status-publish","has-post-thumbnail","hentry","project_category-commercial"],"_links":{"self":[{"href":"https:\/\/scintillawpthemes.com\/demo\/swp-construction-pro\/wp-json\/wp\/v2\/project\/27","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/scintillawpthemes.com\/demo\/swp-construction-pro\/wp-json\/wp\/v2\/project"}],"about":[{"href":"https:\/\/scintillawpthemes.com\/demo\/swp-construction-pro\/wp-json\/wp\/v2\/types\/project"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/scintillawpthemes.com\/demo\/swp-construction-pro\/wp-json\/wp\/v2\/media\/28"}],"wp:attachment":[{"href":"https:\/\/scintillawpthemes.com\/demo\/swp-construction-pro\/wp-json\/wp\/v2\/media?parent=27"}],"wp:term":[{"taxonomy":"project_category","embeddable":true,"href":"https:\/\/scintillawpthemes.com\/demo\/swp-construction-pro\/wp-json\/wp\/v2\/project_category?post=27"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}